In short: Under NEM 2.0, solar exports are credited close to the retail electricity price. Under NEM 3.0 (officially the Net Billing Tariff), they’re credited at an “avoided cost” rate that averages roughly $0.05–$0.08 per kWh, about 75% less. NEM 2.0 customers keep their terms for about 20 years; NEM 3.0 export rates are guaranteed for 9 years. The practical result: on NEM 3.0, using your own solar power, often with a battery, matters far more than exporting it.
Time-sensitive. Last verified: 7 October 2026. Figures below come mostly from installers and utilities and vary by source, utility and year. Check the CPUC and your utility for the terms that apply to you. See the comparison table.
Search for “NEM 2.0 vs NEM 3.0” and you’ll find very different numbers. This guide puts the key differences side by side, explains what they mean for real homes, and points you to the right next step depending on which program you’re on. For the full story of the newer program, read California NEM 3.0 Explained.
Which program are you on?
- NEM 1.0: the earliest version (roughly 2010s). Exports credited at the retail rate, with no interconnection fee, according to some sources.
- NEM 2.0: systems interconnected from about 2016 whose application was complete by 14 April 2023 and which finished construction and final sign-off by mid-April 2026. NEM 2.0 is now closed to new systems. Exports credited near retail, on a time-of-use rate.
- NEM 3.0 (Net Billing Tariff): new interconnection applications to PG&E, SCE and SDG&E on or after April 15, 2023.
Municipal and smaller utilities (for example LADWP or SMUD) set their own rules, so they may not follow either program. If you’re not sure, your utility account or your original interconnection paperwork will show your tariff.
NEM 2.0 vs NEM 3.0 side by side
| NEM 2.0 | NEM 3.0 (Net Billing Tariff) | |
|---|---|---|
| Export credit | Near the retail rate (often quoted at about $0.25–$0.35 per kWh, varying by utility and time of day) | Avoided-cost value, typically about $0.05–$0.08 per kWh on average |
| How the value is set | Time-of-use retail rates | CPUC’s Avoided Cost Calculator, with hourly values that change by season |
| Time-of-use plan | Required | Required, with a steeper peak/off-peak gap on the specific plan |
| Billing | Charges and credits roll over for the year (annual true-up) | Billed monthly, with unused credits carried forward; sources describe the details differently |
| Non-bypassable charges on imports | Yes, often quoted at roughly $0.02–$0.03 per kWh | Yes, similar |
| One-time interconnection fee | Often quoted at roughly $75–$150, varying by utility | Varies by utility |
| Length of the guarantee | About 20 years from interconnection | 9 years for the export rate schedule |
| Role of a battery | Optional; mostly backup | Often essential to make the savings work |
| Typical payback (very rough, sources vary) | about 5–8 years | solar only about 8–12 years; solar plus battery about 7–10 years |
Some sources also describe a declining export “adder” for early NEM 3.0 customers of PG&E and SCE. Check your utility for what applies at the time you interconnect.
What the difference means in real money
Illustrative example only: an 8 kW system exporting about 8,000 kWh a year.
| Credit per exported kWh | Value of 8,000 kWh exported | |
|---|---|---|
| NEM 2.0 | about $0.30 | about $2,400 |
| NEM 3.0 | about $0.07 | about $560 |
That gap of roughly $1,800 a year is why designs changed. Real numbers depend on your usage, rate plan and how much you export, so treat this as a way to see the scale, not a quote.
How system design changes
- Under NEM 2.0, the grid works like a free battery: sizing panels to your annual usage made sense, and exports were valuable.
- Under NEM 3.0, it pays to use your solar power directly and to store midday surplus for the expensive evening hours. That favors smaller systems matched to daytime use, and batteries. See Do You Need a Solar Battery?
- Backup power also matters in California because of wildfire-related shutoffs. See Solar Batteries and Blackouts.
- Behavior: shifting laundry, pool pumps and EV charging to sunny hours helps on both programs, and more on NEM 3.0.
If you’re already on NEM 2.0
Your terms are worth protecting. Adding a battery doesn’t, in general, move you to NEM 3.0, but adding too many panels can. Read Does Adding a Battery Affect Your NEM 2.0 Status in California? before you change your system, and confirm any plan with your utility in writing. If you need more capacity than the allowance, ask whether a non-export addition is possible.
If you’re going solar now
You’ll be on NEM 3.0. That doesn’t make solar a bad idea in California, because electricity prices are high, but the numbers need to be run on your own bill and rate plan. See Solar Panels in California: Complete Guide After NEM 3.0 for costs, incentives and deadlines, How to Calculate Your Solar Payback Period to model it, and How to Compare Solar Quotes and Spot Red Flags to check what installers promise.
What about the rest of the US?
NEM 2.0 and NEM 3.0 are specific to California’s big utilities. Other states and utilities use different net metering or export rules. For the general idea, read Net Metering vs Export Tariffs, and for state incentives see the State Solar Incentives and Rebates Directory.
Common mistakes
- Using NEM 2.0-era payback numbers for a system you’re about to install.
- Assuming every California utility uses NEM 3.0.
- Sizing a system to export as much as possible under NEM 3.0.
- Assuming a battery always pays for itself, or never does, without modeling your plan.
- Expanding a NEM 2.0 system without checking the limit.
- Believing a generic savings estimate that ignores your time-of-use plan.
Next steps
- Find out which program and utility you’re on.
- If you’re on NEM 2.0, read the battery guide above before changing anything. To add panels, see Can You Add Solar Panels to a NEM 2.0 System Without Losing Status?
- If you’re going solar, get quotes modeled on your real rate plan.
- Check incentives and deadlines in our California guide.
Frequently asked questions
What is the difference between NEM 2.0 and NEM 3.0?
NEM 2.0 credits solar exports near the retail rate, while NEM 3.0 (the Net Billing Tariff) credits them at a lower, time-varying avoided-cost rate, averaging roughly $0.05–$0.08 per kWh. NEM 2.0 terms last about 20 years from interconnection, and NEM 3.0 export rates are guaranteed for 9 years.
How much less does NEM 3.0 pay than NEM 2.0?
Sources commonly say about 75% less on average, but the exact difference depends on your utility, the hour and the season.
Do I need a battery with NEM 3.0?
It isn’t required, but it often improves the economics because it lets you use midday solar in the expensive evening hours. Whether it pays back depends on your rates, usage and battery cost.
Which utilities use NEM 3.0?
PG&E, SCE and SDG&E, for interconnection applications on or after April 15, 2023. Municipal and smaller utilities set their own rules.
Can I keep NEM 2.0 if I add a battery?
In general, yes. Adding a battery does not by itself end NEM 2.0 status, but expanding your solar beyond the allowed limit can. Confirm with your utility in writing before you install.
How long are NEM 3.0 export rates locked in?
For 9 years from interconnection, according to the CPUC, which guarantees the export rate schedule for that period.