You have a NEM 2.0 system, your electricity use has grown, and you are wondering if you can add solar panels to NEM 2.0 without losing the plan you are on. The short answer is yes, but only up to a limit. Go over it and the rules change for the extra capacity, or for the whole system. Here is how the limit works and what your options are if you need more.
Can you add solar panels to NEM 2.0 and keep your status?
Yes, within a small allowance. NEM 2.0 customers can stay on their plan for 20 years from the date they interconnected, as the CPUC explains on its net metering page. That protection survives modifications and repairs, as long as the work does not increase the size of the system by more than a set amount.
The limit: the greater of 10% or 1 kW
PG&E’s NEM 2.0 tariff says a modified system stays eligible if the increase is no more than the greater of two numbers:
- 10 percent of the system’s nameplate rating capacity as established when it was originally interconnected, or
- 1 kW.
Whichever is bigger is your allowance. In practice, that means small systems get 1 kW and larger systems get 10%:
| Original system size | 10% of original | Allowance (greater of the two) |
|---|---|---|
| 5 kW | 0.5 kW | 1 kW |
| 8 kW | 0.8 kW | 1 kW |
| 12 kW | 1.2 kW | 1.2 kW |
| 20 kW | 2 kW | 2 kW |
To get a feel for it: with a 5 kW system, two 400 W panels (0.8 kW) fit inside the allowance. Three would add 1.2 kW, which is already over. How your utility counts the size (panel rating or inverter rating) can change the result, so confirm it with them before you order anything.
The percentage is measured against the original system
The tariff compares the increase with the capacity the system had when it was first interconnected, not with its current size. That means the allowance is a total, not a new one each time you add something. If you already expanded the system once, part of the allowance may be used up. Ask your utility how it tracks earlier additions.
The second condition: your annual electricity use
The size limit is not the only rule. The modification also must not push the system above the customer’s annual onsite load. In plain words, the expanded system cannot be larger than what your home actually consumes in a year. If your goal is to cover a new EV or a heat pump, check your numbers first, because that is exactly when this limit can bite.
What happens if you add more than the limit
The tariff does not say you lose everything. A footnote gives two options for the extra capacity:
- Meter the new panels separately under another eligible tariff. The Energy Division’s description of the rule names a Rule 21 non-export arrangement for this. Your original system stays on NEM 2.0, and the 20-year period does not change. The new panels would be set up so they do not send power to the grid (we explain how that works in our guide to non-export solar systems in California).
- Move the entire system to the Net Billing Tariff (NEM 3.0). This is the option to think about hardest. The CPUC states that customers who move from a NEM tariff to the Net Billing Tariff are not eligible for the NBT legacy period, so you would be giving up the better export credits on your existing panels too.
For most households, separate metering of a larger addition, or a small addition inside the allowance, keeps more value than moving everything. Compare both with real numbers before deciding. Our article on NEM 2.0 vs NEM 3.0 shows why the export credit makes such a difference.
Before you add panels: what to do in order
- Find your original system size and interconnection date. They are on your interconnection agreement or your permission to operate letter.
- Work out your allowance using the greater of 10% or 1 kW.
- Check your annual use to make sure the expanded system does not go above it.
- Ask your utility in writing how it measures the increase and whether the addition needs a new interconnection application.
- Get the permission before switching on. As a general rule, new equipment should not be energized until the utility has approved it.
The rule comes from a CPUC decision that applies to the three big investor-owned utilities, but I checked the wording in PG&E’s tariff. SCE and SDG&E publish their own schedules, so confirm the details with yours. Municipal utilities, such as LADWP or SMUD, set their own rules.
From the field: what I check on the roof before adding panels
My installation experience is in Spain, not in California, so the NEM rules in this guide come from research and not from my own jobs. What I can tell you from the roof is how I worked out space: knowing the size of the panels, I walked the roof with a tape measure and a pencil and calculated how many fit. Do the same before you pay for an addition. An allowance of 1 kW on paper is no use if the free roof only fits one panel.
Common mistakes
- Adding panels without checking the original size. The limit depends on the number on your first interconnection, not on what you assume.
- Treating the allowance as new each time. It is measured against the original system.
- Forgetting the annual use cap. A system larger than your consumption does not qualify, whatever the 10% says.
- Letting an installer decide for you. Ask them to tell you in writing which tariff the new panels will be on.
- Selling soon and ignoring it. Buyers care about the status of the system, which is why we wrote about NEM 2.0 when you sell your home.
Frequently asked questions
Can I add a battery to a NEM 2.0 system?
That is a different question from adding panels. We cover it in does adding a battery affect your NEM 2.0 status.
Does repairing or replacing panels count as an addition?
The tariff talks about modifications and repairs together. A repair or like-for-like replacement that does not increase the system size is inside the rule. If the new panels add capacity, the allowance applies.
How long does NEM 2.0 last?
20 years from the date you interconnected, according to the CPUC.
Does this apply to NEM 1.0 as well?
Our research and the tariff language I read concern NEM 2.0. If you are on NEM 1.0, ask your utility for the equivalent rule.
Next steps
Find your original system size, calculate your allowance and call your utility before buying panels. If you are comparing your options in California more widely, start with our California solar guide.
Sources: PG&E Electric Schedule NEM2 (Special Condition 8.b and footnote 7, Advice 6847-E-A, D.22-12-056); CPUC net metering page. Rules can change, so confirm with your utility before you act.